Renovation, conversion and extension of a former locomotive shed into a cultural and event venue.
Client: ATELIER BRÜCKNER GmbH
Facts
Service: construction management support

Total Wagenhallen renovation cost: €32.95 million

Cost stated in the project report, December 2024. Stadt Stuttgart

  • Wagenhallen Stuttgart 03
  • Wagenhallen Stuttgart 02
  • Wagenhallen Stuttgart 01

Wagenhallen

Our contribution completed:
December 2017

Stuttgart · 2017

Task and contribution

Construction management contribution to the conversion of a former locomotive shed into a cultural venue.

Courtyard and historic hall openings
Photograph · Courtyard and historic hall openings
Image credit: Daniel Stauch
Masonry and glazing on the facade
Photograph · Masonry and glazing on the facade
Image credit: Daniel Stauch
Interior with exposed roof structure
Photograph · Interior with exposed roof structure
Image credit: Daniel Stauch

Photograph Courtyard and historic hall openings

Image credit: Daniel Stauch

The former locomotive shed

The large openings recall the building's former use. The refurbishment connects the existing fabric with its role as a cultural and event venue.

Existing fabric and new elements

Masonry and glazing sit alongside one another. The closer view reveals how different elements meet within the same facade.

Retaining the structure

The structure remains visible inside the hall. Marco Gernt's documented contribution was construction supervision of the roof removal while retaining the existing steel structure.

Read project description

A former locomotive shed was developed into a cultural and event venue through renovation, conversion and extension. Marco Gernt contributed to construction management for ATELIER BRÜCKNER.